What Are Design & Engineered Drawings — And Why Does Toronto Require Them?

In Ontario, most significant home renovations require a building permit before work begins. The City of Toronto and all GTA municipalities won't issue that permit without a complete drawing package that meets Ontario Building Code (OBC) and local zoning requirements. A design drawing shows the architectural layout — floor plans, elevations, room dimensions, window and door placements, and how the finished space will look and function. An engineered drawing goes deeper: it covers structural elements like beam sizing, load-bearing wall removals, foundation modifications, and anything that affects the structural integrity of your home. When you apply for a permit without complete, code-compliant drawings, the City sends it back — costing you weeks. GoGajic eliminates that cycle by preparing drawings that get approved the first time.

Professional permit-ready architectural and engineered drawing for home renovation
In 15 years of renovating Toronto homes, I've seen more projects delayed by bad drawing packages than by any other single factor. When we handle drawings in-house, we control the timeline — and we don't lose weeks waiting on a third party.
Nikola Gajic,
Founder & Lead Project Manager, GoGajic Construction

Do You Need Drawings for Your Renovation?

The short answer: if your renovation touches structure, plumbing, HVAC, or changes the use of a space, you almost certainly need a permit — and that permit needs drawings. Here's a quick breakdown:

Renovation Type

Drawings Required?

Load-bearing wall removal

✅ Yes — structural drawings required

Basement underpinning or waterproofing

✅ Yes — engineered drawings required

Legal basement suite creation

✅ Yes — full architectural + structural

Kitchen extension or layout change

✅ Often — depends on scope

Addition or bump-out

✅ Yes — full package required

Second-storey addition

✅ Yes — architectural + structural

Deck over 24″ from grade

✅ Yes — structural drawings required

Simple cosmetic kitchen/bath update

❌ Usually not — confirm with us

Not sure if your project needs a permit?

engineering design workspace stockcake

What's Included in Our Permit Drawing Package

Every drawing package GoGajic produces is built to satisfy the City of Toronto building permit application requirements. Here's exactly what you get:

Architectural Drawings

  • Existing floor plan (as-built conditions)
  • Proposed floor plan with all changes annotated
  • Reflected ceiling plans where applicable
  • Exterior elevations
  • Window and door schedules
  • Cross-section drawings through key areas
  • Site plan showing property lines, setbacks, and building footprint
  • Egress and fire separation details (critical for basement suites) 

Structural / Engineered Drawings (where applicable)

  • Structural framing plans
  • Beam and column sizing calculations (stamped by licensed engineer)
  • Load path diagrams for wall removals
  • Foundation drawings for underpinning projects
  • Connection details for additions and decks
  • Engineer’s stamp and signature on all structural sheets 

Supporting Documentation

  • Energy efficiency compliance (SB-12 where required)
  • HVAC load calculations for additions
  • Zoning compliance summary
  • Complete permit application form preparation  

All structural drawings are stamped by a licensed Professional Engineer (P.Eng) registered in Ontario — a mandatory requirement for City of Toronto structural permit submissions.

From Site Measure to Permit Approval — Our 4-Step Process

Site Assessment & Scope Confirmation

We visit your home, measure existing conditions, and document everything that affects the drawing package. We confirm what permits are required, what drawings are needed, and flag any zoning or code issues before a line is drawn.
Step 1

Design Development

Our team produces architectural drawings showing your proposed renovation in full detail. You review and approve before we move to engineering. Changes at this stage are fast — we're in-house, not waiting on an outside firm for you always.
Step 2

Engineering & Stamping

For any project requiring structural work, our licensed P.Eng reviews the architectural package, performs all necessary calculations, and produces stamped structural drawings. Everything is completed under one roof for a smooth, coordinated permit-ready process.
Step 3

Permit Submission & Follow-Up

We submit the complete package to the City of Toronto (or your GTA municipality) on your behalf. We handle all follow-up questions from the permit office and respond to any revision requests — keeping your project on schedule.
Step 4

Why In-House Drawings Give You a Faster, Cheaper Renovation

Most Toronto renovation contractors outsource their drawing work to a third-party architect or engineer. This creates a broken chain:

  • The contractor doesn’t fully understand the drawings
  • The engineer doesn’t know the contractor’s build sequence
  • Revision requests go back and forth for weeks
  • You pay separately for design, engineering, and construction — with no one entity accountable for the whole

When GoGajic handles drawings in-house, all three phases — design, engineering, and construction — are coordinated by a single team led by Nikola Gajic, who holds a civil engineering degree and has 15 years of hands-on renovation experience in Toronto.

The result: drawings that reflect exactly how we build, permits that get approved faster, and a construction phase with zero surprises.

❌ Typical Contractor

✅ GoGajic

Sends you to a third-party engineer

In-house drawings and engineering

You coordinate between firms

One team, one point of contact

Permit rejections cause delays

Drawings built to pass first submission

Drawing costs billed separately

Included in full-project estimate

Engineer never visits site

Site-measured drawings from day one

engineering design tools stockcake
engineering drawings service 500x500 1

Toronto Building Permit Requirements — What You Need to Know

The City of Toronto processes thousands of residential renovation permits each year. Here are the key facts every homeowner should know before starting a project:

  • Permit fees are calculated based on project value or construction area — typically ranging from $150 to several thousand dollars for major renovations
  • Processing times for residential permits range from 10 business days (simple projects) to 8–12 weeks for complex additions or new suites
  • Incomplete applications are returned without review — the most common reason is missing or non-compliant drawings
  • Zoning compliance must be confirmed before permit submission — setbacks, lot coverage, and building height all affect approval
  • Unpermitted work discovered during a home sale can collapse a real estate deal and result in orders to remove or reconstruct at the homeowner’s expense
  • Fines for building without a permit in Toronto can reach $50,000 for individuals under the Ontario Building Code Act

GoGajic has navigated this process hundreds of times across Toronto, North York, Scarborough, Etobicoke, Mississauga, Brampton, and the broader GTA. We know exactly what each municipality’s permit office expects — and we produce drawings accordingly.

Design & Engineering Drawing Services Across Toronto & the GTA

GoGajic provides in-house design and engineering drawings for renovation projects throughout:

No travel surcharges. No outsourcing. The same team that draws your project builds it.

Frequently Asked Questions — Design & Engineered Drawings

How long does it take to produce a drawing package?

For most residential projects, architectural drawings are ready within 7–10 business days of the site visit. If structural engineering is required, add 5–7 business days for calculations and stamping. Complex additions or basement suites may take 3–4 weeks for the full package.

Do I pay for drawings separately from the renovation?

For full renovation projects that GoGajic is also building, drawing fees are typically bundled into the project estimate. For drawing-only services (where the client is using a different builder), we provide a separate drawing package quote.

Will GoGajic submit the permit on my behalf?

Yes. We prepare and submit the complete permit application to the City of Toronto or your GTA municipality. We handle all follow-up correspondence with the permit office — you don't have to navigate that process yourself.

What if the City requests revisions to the drawings?

Revision requests from the permit office are handled by our team at no additional charge, provided the revision is related to the original scope. Because our drawings are prepared by experienced professionals who know what reviewers look for, revision requests are rare.

Do I need an engineer's stamp for my project?

Any project involving structural changes — wall removals, beam installations, underpinning, additions, deck structures — requires a stamped structural drawing from a licensed P.Eng. GoGajic includes this in-house. Purely cosmetic or non-structural renovations typically do not require an engineer's stamp, though we assess this on a project-by-project basis.

Can you handle drawings for projects in Mississauga or Brampton, not just Toronto?

Yes. We are familiar with the permit requirements of all GTA municipalities — City of Mississauga, City of Brampton, Region of Peel, York Region, and others. Requirements vary slightly by municipality, and we account for that in every drawing package.

Get Permit-Ready Drawings for Your Toronto Renovation

Don’t let a missing or rejected drawing package delay your renovation by weeks. GoGajic produces permit-ready architectural and structural drawings in-house — and then builds the project ourselves, so everything is coordinated from the first sketch to the final inspection.

In-house drawings. Licensed P.Eng stamp. City of Toronto permit submission included. 5-year workmanship warranty on all construction work.